DTS² to upgrade Het Park Hoorn trekking installation

DTS² has been commissioned by Schouwburg Het Park in Hoorn to upgrade the tow installation. Here, the existing winches will be made suitable for a load of 500 kg and will comply with the latest standard EN17206-UC4. A sustainable option where performance and quality are greatly improved. By performing a reverse engineering of the installations, it was possible to carry out such an improvement of the installation.

In addition, DTS² will replace the system's control with Waagner Biro's latest (CAT V5) controller. With this control system from one of the world's largest control specialists, the functionality and safety of the installation are brought to a very high level. This is carried out in close cooperation with Waagner Biro, with the design, construction and installation being realized by DTS².