VU Amsterdam hoisting installations

In the Vrije Universiteit Amsterdam, we have built two halls in the new building. In cooperation with the advisor Theateradvies B.V. and the customer, we have now completed the lifting installations for both halls.

A total of ten thru-axle winches were installed in room 2 and four ASM HCWA-JR winches in room 5. The latter winches pull several tubes per winch via sleigh tracks. In addition, both halls are equipped with Flycon controls.