The Leietheater in Deinze can start with its new pull installation

In Deinze, hard work has recently been built on the new Leietheater. For DTS², this means that we have installed the new 32-winch draft wall with an Art-con control. This enables the theater to receive and program the most complex performances.

In addition to the pull wall, we have of course also carried out various constructive activities, such as a state of the art roller loft with a slatted floor, lighting bridges and a grid in the small hall.

With this installation, the Leietheater is ready for the future.

Installations

  • 32 AV winches — 500 kg — 1.2 m/s — lifting height 17.5 m
  • Art-con controller — SIL3 certified
  • Slatted floor in the roller loft
  • Exposure bridges
  • Grid in the small hall
Details

To minimize the noise production of the winches, all turning wheels are fully sound-insulated. This means that each turning wheel is placed in its own acoustically insulated box.